The nvisin tool for this: Client Inventory Portal. Inventory and fulfilment reporting for 3PL warehouses.
When a brand disputes a 3PL invoice, it's rarely because the rates are wrong. The rates are in the contract. It's because a quantity on the invoice doesn't match anything the client can see: more pallets than they think they have, more labels than orders, additional-item charges they can't check.
The fix is to explain each fee the same way every time: what it covers, how it's counted, and where the count comes from. This is the approach behind Fulfilment Billing Statements, and it works on any invoice.
The fees, one by one
| Fee | Usual unit | What triggers it | What to show the client |
|---|---|---|---|
| Receiving | Pallet, carton, unit or hour | Inbound stock checked in and put away | Each receipt, with its ASN and count |
| Storage | Pallet position, bin, shelf or cubic foot | Space occupied over the period | The counts and the counting method |
| Pick and pack | Order | Each order shipped | Orders shipped |
| Additional items | Unit | Each item beyond the first in an order | Units shipped minus orders shipped |
| Packaging | Box, mailer, insert | Materials used | Count by packaging type |
| Shipping | Label | Each parcel sent, including reships | Labels, with reships listed |
| Returns | Unit or parcel | Returns received and processed | Units, and what happened to each |
| Special projects | Hour | Kitting, relabelling, inspections | The approval and the hours |
| Minimums and surcharges | Month or unit | Low volume, long-term or peak storage | The rule, and why it applied |
The fees that cause disputes
Storage: how it's counted
Storage is the line clients question most, because they can't see the warehouse. 3PLs count it in different ways:
- A single count on a set day, often month-end.
- An average of several counts, often weekly.
- The peak: the highest count in the period.
None of these is wrong, but the client must know which one you use, and see the counts. A client who moved stock out on the 30th and gets billed on a peak from the 10th will dispute it unless they knew the rule.
Pick and pack vs additional items
An order with three items is usually one pick-and-pack charge plus two additional-item charges. Show orders shipped and units shipped side by side, so the client can do the subtraction themselves.
Shipping and reships
If there are more labels than orders, list the reships by order number and say why each one happened. Say whether reships caused by your pick errors are billed; most clients expect them not to be.
Minimums and surcharges
Account minimums, long-term storage fees and peak-season surcharges feel like penalties if they appear without warning. Show the rule on the invoice, and warn the client the month before they apply.
A worked example
A fictional 3PL, Kettle Creek Fulfilment, bills storage per pallet position on the average of four weekly counts. For one client in October:
| Count date | Pallet positions |
|---|---|
| October 7 | 38 |
| October 14 | 41 |
| October 21 | 44 |
| October 28 | 42 |
| Average billed | 41.25 |
A month-end count would have been 42, and a peak 44, so the client is paying for 41.25 positions under the agreed method. Shown like this, with the method named on the invoice, the line explains itself.
The same month, the client shipped 3,398 orders containing 6,013 units, so pick and pack is 3,398 orders and additional items are 2,615 units. Shipping labels were 3,412: 3,398 orders plus 14 reships (6 pick errors, not billed, and 8 carrier damage). Every quantity on the invoice can be checked against the monthly report, which is laid out in What 3PL clients want to see every month.
Presenting fees so they aren't disputed
- Same words everywhere. The fee schedule, the invoice and the report should name each fee identically.
- A count behind every line, with where it came from.
- The storage method on the invoice, not only in the contract.
- Exceptions explained up front: reships, minimums, surcharges, special projects with the approval date.
- Invoice and report together. A charge sent with its explanation rarely gets questioned.
Common mistakes
- Changing the counting method mid-contract without telling the client.
- Special projects without approval. Get it in writing before the hours are spent.
- Surprise surcharges. Warn a month ahead.
- An invoice built from different data than the report. They'll disagree eventually, and the client will believe the report.
Frequently asked questions
What fees do 3PLs charge?
Common fees are receiving (per pallet, carton, unit or hour), storage (per pallet, bin, shelf or cubic foot), pick and pack (per order, plus a fee per additional item), packaging materials, shipping labels, returns processing, and hourly special projects such as kitting. Some 3PLs also have account minimums and surcharges for long-term or peak-season storage.
How is 3PL storage usually billed?
Per storage unit, such as a pallet position, bin or cubic foot, over a period. 3PLs count it differently: a single count on a set day, an average of several counts, or the highest count in the period. The method should be in the contract and stated on the invoice.
What is a pick and pack fee?
A pick and pack fee covers picking an order's items from storage, packing them and preparing the parcel. It's usually charged per order, often with an extra fee for each item beyond the first.
How can a 3PL reduce billing disputes?
Use the same activity data for the invoice and the client's reports, show the count behind each invoice line, state how storage is counted, explain differences such as reships up front, and keep the fee schedule's wording identical to the invoice's.